Built for the Truck: Meeting LCRI Verification Deadlines in the Field
LSL Verification
Data Management & Reporting
Lead & Copper Rule
.png)
Register Here
Watch replay
The Lead and Copper Rule Improvements (LCRI) raised the bar on service line verification, and for a lot of water systems, the hardest part is the unknowns. Every unknown line is a question mark on your inventory and a potential dig you may not need. The good news: you don't have to verify your way through all of them the hard way.
Join the 120Water team for a working session on how to meet LCRI verification requirements faster, spend less doing it, and capture the work cleanly from the field with our latest tool.
What we'll cover:
- What LCRI actually requires for verification. A clear, plain-language breakdown of the verification obligations, so you know exactly what counts and what's expected.
- How predictive methods reduce unknowns and save money. We'll walk through how predictive modeling helps you reduce your digs and show you tools to calculate the time and dollars you stand to save.
- 120Field in action. A live look at the mobile tool built for the truck, not the office. See how crews log verifications, replacements, and kit drop-offs once, from anywhere, and watch it flow straight into your data records with no re-keying later.
Whether you're mapping out your verification strategy or looking for a better way to capture fieldwork, you'll leave with a clearer path and practical tools you can put to work right away.
Save your seat by completing the form on this page.
Speakers




.png)


