LCRI Annual Notification Requirements: Who Gets a Letter, What It Must Say, and When It's Due
Communications
Lead & Copper Rule
.png)
Every address served by a lead, galvanized requiring replacement (GRR), or unknown service line needs a notice before December 31, 2026. For many systems, this is round three. That should make it easier. It also raises the stakes a little, because residents have seen one of these letters before, and some of them still have questions nobody answered.
In 120Water's webinar on building community trust ahead of the Lead and Copper Rule Improvements (LCRI), Isaac Pellerin, SVP of Corporate Strategy, argued that the utilities that come out ahead treat notification requirements as a starting point. The requirement itself is simple. Sending a letter that moves residents to a next step takes more planning.
The Requirement in Plain Terms
First, a common mix-up: your 2026 notices fall under the Lead and Copper Rule Revisions (LCRR), not the LCRI. Annual notification has been required under the LCRR since October 16, 2024, and the EPA kept that requirement in place when it finalized the LCRI. The LCRI brings its own notification rules, but those don't start until its compliance date.
Who gets a notice. Anyone served by a lead, GRR, or unknown service line. Yes, unknown counts. New customers at one of those addresses also get a notice when service starts.
What it has to say. Every notice states the service line's classification (for unknowns, that the material is unknown but may be lead), includes the required lead health effects language, and lists steps people can take to reduce their exposure. The last piece changes by classification:
- Lead lines need information on replacement opportunities and programs that help finance replacement.
- GRR lines need information on replacement opportunities and programs that help finance replacement.
- Unknown lines need information on how the material can be verified.
How to send it. By mail, or by another method your primacy agency approves.
What comes after. Notices go out every year, and the state certification covers the full calendar year. That's why 2026 letters need to reach residents by December 31. By July 1, 2027, you certify to your state that the notices went out and include a copy of what you sent. Skip that step and you're looking at a Tier 2 public notice, which is a much less fun letter to write.
Templates. The EPA provides three templates, one per classification, in English and Spanish. Some states require their own templates or specific language, so check with your primacy agency before you print anything.
Answer Their Questions Before They Ask
When a resident opens this letter, they want to know three things. Is my water safe to drink today? What is my utility doing about lead? Why did I get this? The required language covers the regulatory facts. It wasn't written for someone reading at the kitchen table after a long shift.
Nothing stops you from adding a plain-language cover note or a short FAQ alongside the required content. The systems that handle this well have their answers ready before the letter lands, so the first thing a resident reads is a clear next step.
Unknown lines deserve extra care. To most homeowners, "unknown" sounds a lot like "lead," even when it turns out not to be. Give those residents a way to help close the gap: share records they might have, check the pipe where it enters the home, or schedule a visit.
Remember who else will field these questions. Many water and wastewater personnel work in field operations. When someone sees a crew on their street a week after the letter arrives, that crew becomes your communications channel. A few talking points and a website to point people toward will cover most conversations.
Finally, point the letter somewhere useful. Systems serving more than 50,000 people must post their inventory online, and it's a smart move for everyone else. A searchable map gives residents a place to look up their own address instead of calling the front desk.
Get the Logistics Right
When it comes to communications, most of our webinar attendees were in decent shape. Roughly 40% had already started sending letters, and close to half had a plan ready but hadn't hit send yet. If you're in either group, these practices will keep the next few months calm.
Prep early. Address cleanup and list segmentation take longer than anyone budgets for. Lock in your content, mailing lists, internal sign-off, and staff FAQs before a single letter prints.
Batch by material type. Three classifications means three letters. Sending them in separate batches keeps the content accurate and makes follow-up calls easier for your customer care team, since they'll know which letter the caller is holding.
Send before the holidays. USPS slows down in December, and every batch of notices brings a wave of calls. Mailing in October or November spreads that volume out. Nobody wants to explain service line classifications on December 23.
Keep the paper trail. Record what went to which address and when. Come July 1, that record makes certification a quick job.
120Water's platform can handle most of this work. It filters affected customers by classification, applies EPA or state-approved templates, prints and mails through local mail houses, and tracks every notice so the audit trail builds itself.
Quick Answers to Common Questions
If a line is classified as unknown, does that resident still need a notice? Yes. Unknown lines require an annual notice, just like lead and GRR lines. Use the letter to start the work of identifying the material.
Can we write our own letter instead of using a template? You can adapt the language, as long as every required element is there. Check your state's rules first, since some primacy agencies require their own templates or wording.
When can we stop sending notices to an address? Once the entire service line, on both the utility and customer sides, is no longer lead, GRR, or unknown.
Are notices required as part of the LCRI? Yes, and the compliance date is December 1, 2027 (thirty days after the baseline inventory deadline of 11/1/27)
Watch the Full Session
Notices are only one piece of a community engagement strategy. The full webinar goes further: how utilities are partnering with local organizations to reach residents, how to stay transparent when the news isn't good, and why celebrating milestones matters more than most systems think.
If you missed it, watch the recording and grab our updated LCRI Annual Notification Checklist to keep your team on track through December.
.png)
.png)
