LCRI School and Childcare Sampling: A Five-Step Breakdown
School & Facility Sampling
Lead & Copper Rule

Of all the moving parts in the Lead and Copper Rule Improvements (LCRI), school and childcare sampling may be the one most likely to catch water systems off guard. It applies to the schools and childcares you serve, even if you have no lead service lines. It doesn't end after the first round of samples. And for the first time at the federal level, it makes the water system responsible for offering lead testing in the schools and childcares it serves.
Below is a step-by-step look at what the program requires, the details that trip people up, and how a couple of early movers are getting started ahead of the November 1, 2027 compliance date.
Understand What Makes This Program Different
Many states already run lead testing programs for schools and childcares. Most are voluntary. The facility usually owns the work. And the requirements vary a lot from one state to the next.
The LCRI flips all three. The program is mandatory, the water system carries the responsibility, and the requirements are the same everywhere. The federal rule is the floor: every state has to meet it, and some may set stricter requirements.
The program also splits facilities into two tracks. Elementary schools and childcares get a stricter program in the early years because children under six face the greatest risk from lead exposure. Secondary schools follow a lighter, on-request model from the start.
Get the Program Year Right
The school and childcare program runs on its own calendar: November 1 through October 31, every year. It never shifts to a calendar year. That makes it different from the service line replacement program year, which moves to a calendar-year cycle after 2028.
This matters because nearly everything in the program is annual. Communications, sampling targets, and certifications all run on the November-to-October year. Starting January 30, 2029, water systems will certify to the state what they completed in the previous program year.
Step 1: Build Your Facility List
Your list of schools and childcares is due to the state on November 1, 2027, the same day as your inventory. It should include public and private elementary and secondary schools plus licensed childcare facilities. Leave off colleges, trade schools, unlicensed childcares, and any facility that treats its own water, since it's a separate water system you don't serve.
There's one more exemption, and it has two parts. A facility can stay off the list if it was built or fully replumbed after January 2014 and is served by a non-lead service line. Meeting one condition isn't enough.
For sources, start with the EPA's guide to compiling your list, which walks you through the process. Next, check out the EPA's facility identification guide, which links to each state's school and childcare directories. Pick a sourcing strategy and stick to it. The list isn't set in stone: you'll certify good-faith updates every year and submit an updated list (or confirm no changes) every five years.
If facilities in your system were already sampled through an existing program in 2021 or later, you may qualify for a waiver. The EPA recognizes five program types that can count, and its waiver checklist is a practical way to see where yours lands. Partial waivers are possible.
Step 2: Send the Annual Lead Health Risk Communication
This is the step that gets lost. Every facility on your list gets a lead health risk communication every program year. No waiver covers it, and it doesn't have an end date.
The letter has to cover health effects (using required language), sources of lead, and steps to reduce exposure. A fourth section depends on the facility's service line and connector materials. That means you may need different letters for different facilities.
Steps 3 and 4: Reach Out, Then Sample
For elementary schools and childcares, the first five years work as a mandatory ask. You notify at least 20% of facilities each year that they're eligible, send a proposed schedule and the EPA's 3Ts (Training, Testing, and Taking Action) toolkit, and sample at least 20% per year so every facility has been offered sampling by the end of year five. A facility that refuses, or doesn't respond after two documented attempts, still counts toward your 20%. From year six on, these facilities move to an on-request model.
Secondary schools are on request from day one. You must tell them how to request sampling, but you only sample if they ask.
When sampling does happen, the protocol is specific:
- Instructions are sent to the facility 30 days ahead
- Five outlets per school and two per childcare, or every available outlet if a facility has fewer. They include: drinking water fountains, cold water faucets, drinking water fountains with coolers, ice makers, and central chiller units
- Cold water, 250 mL samples, are analyzed for lead only
- An 8-18 hour stagnation period (so Monday morning after an empty weekend is not your window, nor during summer or winter break when the facility is empty)
- Samples are collected by the water system, the facility, or a trained third party
No facility has to be sampled more than once in any five-year period.
Step 5: Share Results and Report
Results go to the facility, the state, and the local health department within 30 days, along with remediation options such as taking an outlet out of service or posting do-not-drink signage.
Two details matter here. First, no lead level triggers required action by the water system. Second, the decision to remediate and the cost of doing so belongs to the facility. The LCRI's 10 parts per billion (ppb) action level for compliance sampling doesn't mark a line between safe and unsafe, so expect facilities to ask you what their numbers mean. Point them to the 3Ts for guidance and be ready for the conversation.
And don't assume a non-lead inventory means clean results. A 250 mL sample mostly captures what's in the fixture and any nearby plumbing, so lead can show up even in a fully non-lead system.
On the reporting side, annual certifications begin January 30, 2029. Your 2027 Consumer Confidence Report (CCR), due July 2028, must also include a statement about the program that directs questions to the facilities.
Make It Easy for Facilities to Say Yes
Compliance comes from reaching every facility and documenting each attempt. But facilities and families only get answers about their water when facilities take part. Earning that participation takes some empathy.
Picture a childcare director opening your letter. They may never have heard of the Lead and Copper Rule. They don't know why you're writing or what their results could mean. Before sampling, they need to understand what's being asked and that you're a partner, not an inspector. During sampling, they need simple steps and someone to call. After results, they need plain explanations and practical next steps they can share with staff and families.
A few habits help. Send everything under the water system's name and logo, since facilities already know you. And keep every notice, outreach attempt, and result in one place with dates attached. Your annual certification will ask you to show your work.
Learn From Systems That Started Early
Summerville Commissioners of Public Works in South Carolina got ahead by keeping the lift light for its own team. Coordination for the 10 schools in the local public school district ran through a single point of contact, with 120Water handling kits, communications, and lab coordination. Thirteen of the schools in the system finished sampling well ahead of the regulatory schedule, with three other schools in their system sampled separately with individual contacts from each school. Childcare sampling is still underway, with outreach set to resume in early 2027.
Savannah, Georgia took a different path. It's building alignment before a single sample is taken. City council approved the program publicly, the city manager and public health department were briefed, and coordination with the school superintendent is underway, with families to follow. One web page anchors the messaging. Savannah is also sampling its secondary schools proactively instead of waiting for requests.
Both programs were shaped by the communities they serve. Before you build yours, ask whether your state already has a testing program, whether your facilities took part, and what your history with the community looks like.
Watch the Full Session
This is one piece of the LCRI, and it doesn't come with an off-ramp. The record you build in year one is the one you'll lean on in year five. To keep the rest of the rule in view, 120Water's LCRI Compliance Tracker breaks every requirement into a row-by-row checklist.
We recently hosted a webinar on this topic — it goes deeper on the step-by-step requirements, the EPA resources worth bookmarking, the waiver criteria, and how a fully managed program handles kits, labs, and result letters. It's a good place to start if you're still deciding whether to run this in-house or bring in support.
Watch the webinar: https://www.120water.com/webinars/preparing-for-lcri-school-child-care-compliance-requirements-to-real-world-results


.png)